Back to ESC Homes
All localities

County

King George County

Allowed, permit Confirm with the locality

Local term: Dwelling, Accessory

Last verified 2026-11-25

How it's allowed

Yes: 1 per lot

Permit

By right (B) in 5 districts, Special Exception (SE) in 2 per the use table; per summary: by right in A-1, A-2, A-3, R-1, R-2; SE in R-C and M-U

Max size

Larger of 800 sq ft or 35% of the principal dwelling's finished floor area (per summary)

Parking

+1 off-street space (per summary)

Minimum lot

5 acres (agricultural districts); 15,000 sq ft with public water and sewer (residential) (per summary)

Attached or detached

Attached or within a SFD; detached in agricultural districts (per summaries; conflicting, verify)

Number per lot

1

Where it applies

A-1, A-2, A-3, R-1, R-2 by right; R-C, M-U by SE (per summary; the column order of the use table was not verified)

Short-term rental

Rentals minimum 30 days (per summary)

Ordinance

King George County Zoning Ordinance Art. VII Div. 6 (Use Performance Standards); Ord. of 12-19-2023

Research note

The use-table row 'Dwelling, Accessory B B B B B SE SE' was read from the mirror. Municode (official) is blocked, so the size, lot and rental details come from the search summary. The ordinance predates 2026 (12/19/2023), so the County is likely exempt from SB 531 (inference). At the BOS meeting on 5/18/2026, resident Nathan Hoy said special exception fees (~$5,900) make a family ADU on 118 acres nearly impossible. Supervisors Davis, Binder and Metts said the ordinance needs a revisit; Sullins promised a future agenda item (OpenVirginia summary).

2027 state law

Va. Code § 15.2-2292.4, effective July 1, 2027, likely does not apply to a locality that adopted an ADU ordinance before January 1, 2026. Whether this locality's ordinance qualifies was not decided in the research.

Statewide law

Sources

Latest news

No news is listed for King George County yet.

Upcoming and recent meetings

2026-05-18

Public comment: accessory dwelling rules and special exception fees; supervisors asked for an ordinance revisit

Board of Supervisors

Discussed; future agenda item promised (no action)

Source

Virginia ADU Guide provides general information for educational purposes only. This information is not legal advice and should not be relied upon as such. ADU regulations change frequently, and local requirements may vary. Always consult with your local planning and zoning department, and consider hiring licensed professionals for your specific project. We make no guarantees about the accuracy, completeness, or timeliness of the information provided.

Always verify regulations with your local planning department.

Free Lot Check