County
Greene County
Local term: Accessory dwelling unit (ADU)
Last verified 2026-11-25
How it's allowed
by-right / administrative approval
Permit
Staff approval, no hearing | An ADU is a permitted-by-right use in A-1, C-1, and R-1. A zoning permit is required, and the administrator issues it when the proposed use conforms to the ordinance and other applicable requirements. | The ordinance does not set a separate ADU review process or decision deadline. | Quote: "The installation of accessory dwelling unit is permitted by-right in Agriculture, A-1, Conservation, C-1 and, Residential, R-1, zoning districts." (Articles 3-1-1.14, 4-1-1.6, 5-1-1.8, and 16-1) | Quote: "If the proposed building or use conforms with the provisions of this ordinance and all other county and state regulations, a Permit shall be issued to the applicant by the Administrator." (Article 16-1)
Max size
Up to 800 sq ft | An attached ADU may be no larger than 800 sq ft. | The same size limit applies whether the ADU is located inside the house or in an accessory structure. | Quote: "The accessory dwelling unit shall be no larger than 800 square feet, or smaller than 300 square feet." (Article 22, definition of accessory dwelling unit, paragraphs G and I) || Up to 800 sq ft | A detached ADU may be no larger than 800 sq ft. | The same size limit applies whether the ADU is located inside the house or in an accessory structure. | Quote: "The accessory dwelling unit shall be no larger than 800 square feet, or smaller than 300 square feet." (Article 22, definition of accessory dwelling unit, paragraph I)
Owner occupancy
Yes | The owner must occupy either the primary dwelling or the ADU as a permanent legal residence. | Temporary absences may not exceed six months, and owner occupancy must be verified by a notarized affidavit. | Quote: "The owner must occupy at least one of the dwelling units as a permanent legal residence, except for temporary absences not to exceed six months." (Article 22, definition of accessory dwelling unit, paragraph A) | Quote: "The owner occupancy shall be verified by a notarized affidavit from the owner." (Article 22, definition of accessory dwelling unit, paragraph A)
Parking
Up to 2 spaces | Two additional off-street parking spaces must be provided for an ADU. | Quote: "Two additional off-street parking spaces shall be provided for the accessory dwelling unit." (Article 22, definition of accessory dwelling unit, paragraph K)
Attached or detached
attached: Up to 800 sq ft; detached: Up to 800 sq ft
Number per lot
The ordinance allows no more than one ADU per parcel. | ADUs are permitted by right in the Agriculture, Conservation, and Residential R-1 districts. | Quote: "Not more than one accessory dwelling unit may be established on the parcel." (Article 22, definition of accessory dwelling unit, paragraph F) | Quote: "The installation of accessory dwelling unit is permitted by-right in Agriculture, A-1, Conservation, C-1 and, Residential, R-1, zoning districts." (Articles 3-1-1.14, 4-1-1.6, and 5-1-1.8)
Where it applies
Yes | ADUs are permitted by right in the A-1, C-1, and R-1 zoning districts. | The local definition covers a separate living unit on a single-family residential lot. | Quote: "The installation of accessory dwelling unit is permitted by-right in Agriculture, A-1, Conservation, C-1 and, Residential, R-1, zoning districts." (Articles 3-1-1.14, 4-1-1.6, 5-1-1.8, and 22, definition of accessory dwelling unit)
Ordinance
Articles 3-1-1.14, 4-1-1.6, 5-1-1.8, and 22, definition of accessory dwelling unit; Articles 3-1-1.14, 4-1-1.6, 5-1-1.8, and 16-1; Article 16-1; Article 22, definition of accessory dwelling unit, paragraph F; Articles 3-1-1.14, 4-1-1.6, and 5-1-1.8; Article 22, definition of accessory dwelling unit, paragraph I; Article 22, definition of accessory dwelling unit, paragraphs G and I; Article 22, definition of accessory dwelling unit, paragraph K; Article 22, definition of accessory dwelling unit, paragraph A
2027 state law
Va. Code § 15.2-2292.4, effective July 1, 2027, likely does not apply to a locality that adopted an ADU ordinance before January 1, 2026. Whether this locality's ordinance qualifies was not decided in the research.
Statewide lawSources
Latest news
No news is listed for Greene County yet.
Upcoming and recent meetings
2026-11-18
Work session: proposed revisions to the ADU provisions, compared with Va. Code § 15.2-2292.4; direction before an amendment goes to public hearing
Planning Commission
Work session held (agenda)
SourceVirginia ADU Guide provides general information for educational purposes only. This information is not legal advice and should not be relied upon as such. ADU regulations change frequently, and local requirements may vary. Always consult with your local planning and zoning department, and consider hiring licensed professionals for your specific project. We make no guarantees about the accuracy, completeness, or timeliness of the information provided.
Always verify regulations with your local planning department.