Town in Northampton County
Cape Charles
Local term: Accessory dwelling unit (accessory dwelling)
Last verified 2026-11-25
How it's allowed
Conditional use (§ 32-91) in R-1, R-2, R-3 and CR. One ADU, located in an accessory building.
Permit
Conditional use under Town Code Ch. 32 Art. IV § 32-91(j). Annual notarized affidavits (ADU use + safety compliance) due March 15. Historic District Review Board approval where applicable.
Max size
Must not exceed 45% of the main building's floor area
Parking
Per § 32-95(b)(3)(a)(5), on- and off-street; calculated from square footage
Minimum lot
Lot must meet the district's minimum lot area
Attached or detached
Detached: must be located in an accessory building
Number per lot
1. Max 1 kitchen, 1 bathroom and a sleeping area.
Where it applies
R-1, R-2, R-3, CR (the form also mentions R-E in one passage)
Short-term rental
Allowed: an ADU may be rented short-term (<30 days, subject to § 32-104 STR permit) or long-term
Utilities and septic
May have a separate water meter; must have its own Town-issued trash receptacle
Ordinance
Cape Charles Town Code Ch. 32 Art. IV § 32-91(j); § 32-104 (STR)
Research note
Read the official 'Affidavit for Accessory Dwelling Unit Use' (revised 1/2026) in full; it restates the ordinance criteria. The ordinance text itself (media/14636) is bot-blocked. Planning: 757-331-3259 x31.
2027 state law
Va. Code § 15.2-2292.4, effective July 1, 2027, likely does not apply to a locality that adopted an ADU ordinance before January 1, 2026. Whether this locality's ordinance qualifies was not decided in the research.
Statewide lawSources
Planning departmentLatest news
No news is listed for Cape Charles yet.
Upcoming and recent meetings
No board or planning meetings are listed for Cape Charles yet.
Virginia ADU Guide provides general information for educational purposes only. This information is not legal advice and should not be relied upon as such. ADU regulations change frequently, and local requirements may vary. Always consult with your local planning and zoning department, and consider hiring licensed professionals for your specific project. We make no guarantees about the accuracy, completeness, or timeliness of the information provided.
Always verify regulations with your local planning department.